The House: Week Two
Well not too much going on, but some progress. The garage has been filled in and they've built up the basement walls (where needed). Since I have never built a house before I can only assume that the first floor is next. Or maybe they first have to give the basement a floor. Hey I don't know. Take a look at the photos I stitched together below of the basement.
Saturday, March 31, 2007
Where's My House???
OK, so we've been waiting for the folks at Mill Creek to tell us that the permit has arrived from the city and that they will begin building our house. It has been almost two months since we signed the contract and we were led to believe that the "ball" would be rolling by now. So on Thursday Christie called them and asked, "What's up?" Turns out there was a mix up and they forgot to call us. They received the permit on March 19th and broke ground on the 23rd. Cool!
So on Friday we decided to take a drive out there and see exactly how much progress they actually made. I figured that there might be a shovel stuck in the ground and that was there way of breaking ground. Well guess what? The foundation is there!!!

See that house in the background? The one on the left. That is the same model as ours.
So on Friday we decided to take a drive out there and see exactly how much progress they actually made. I figured that there might be a shovel stuck in the ground and that was there way of breaking ground. Well guess what? The foundation is there!!!
See that house in the background? The one on the left. That is the same model as ours.
Sunday, March 4, 2007
The Stewart, El. III
We're building a new house in Geneva, Illinois. To be more specific, it will be in the Oakmont neighborhood of Mill Creek. The model we will be having built is the Stewart, elevation III, and after all of our additions (or bump-outs as they call them), it will tip the scales at roughly 3000 square feet. Nothing spectacular compared to everyone else we know, but hey, it will be plenty big for the five of us (Christie, Zachary, Gonzo, Pinot, and me). If you look at the website, elevation III of the Stewart model more closely resembles the Remington model that they have pictured, though it will have a front porch.
We signed the contract and selected all the structural upgrades at the beginning of February. The last few weeks we've been going back and forth trying to choose all the non-structural upgrades we'd like. We're still not done, but at least the plans were drawn up and they were sent to the city (county?) for permits. Hopefully they will break ground by the end of March, and if so, they say we'd be closing in the beginning of August (we'll see about that).
We signed the contract and selected all the structural upgrades at the beginning of February. The last few weeks we've been going back and forth trying to choose all the non-structural upgrades we'd like. We're still not done, but at least the plans were drawn up and they were sent to the city (county?) for permits. Hopefully they will break ground by the end of March, and if so, they say we'd be closing in the beginning of August (we'll see about that).